Government OKs JR Tokai's Maglev Train Project

TOKYO, JAPAN - OCT. 17: The government approved an application by Central Japan Railway Co. to build a magnetically levitated train line linking Tokyo and Nagoya by 2027 in a costly project that faces significant technical hurdles on Friday, October 17. The firm is expected to start construction possibly later this month, aiming to complete the line in 2027 that will link Tokyo's Shinagawa and Nagoya in central Japan in only 40 minutes, compared with 88 minutes at the shortest taken by the current bullet train operated by the company. The company, also known as JR Tokai, plans to extend the line further westward to Osaka by 2045, shortening the trip between the two major Japanese cities to 67 minutes from the current 138 minutes minimum travel time for a bullet train. The overall cost of the work is estimated at 9 trillion yen, about 84.5 billion of US dollars. Transport minister Akihiro Ota told a press conference that there is a concern about the project's environmental impact, pointing to the need for JR Tokai to win acceptance from local residents. The Tokyo-Nagoya maglev train line will pass through seven prefectures. According to the construction plan, 86 percent of the 286-km Tokyo-Nagoya line will be tunnels and trains will run more than 40 meters underground in urban areas.
TOKYO, JAPAN - OCT. 17: The government approved an application by Central Japan Railway Co. to build a magnetically levitated train line linking Tokyo and Nagoya by 2027 in a costly project that faces significant technical hurdles on Friday, October 17. The firm is expected to start construction possibly later this month, aiming to complete the line in 2027 that will link Tokyo's Shinagawa and Nagoya in central Japan in only 40 minutes, compared with 88 minutes at the shortest taken by the current bullet train operated by the company. The company, also known as JR Tokai, plans to extend the line further westward to Osaka by 2045, shortening the trip between the two major Japanese cities to 67 minutes from the current 138 minutes minimum travel time for a bullet train. The overall cost of the work is estimated at 9 trillion yen, about 84.5 billion of US dollars. Transport minister Akihiro Ota told a press conference that there is a concern about the project's environmental impact, pointing to the need for JR Tokai to win acceptance from local residents. The Tokyo-Nagoya maglev train line will pass through seven prefectures. According to the construction plan, 86 percent of the 286-km Tokyo-Nagoya line will be tunnels and trains will run more than 40 meters underground in urban areas.
購買授權

請告訴我們您希望何時、何地及如何使用此資產,以獲得個人化價格。

詳情

編輯性內容編號:
457696726
圖像集:
Kyodo News
建立日期:
2014年10月17日
上傳日期:
授權類型:
權利準備 (Rights-Ready)
發佈資訊:
無許可授權 更多資料
短片長度:
00:02:08:11
位置:
Chiyoda, Tokyo, Japan
原版:
QuickTime 8-bit Photo-JPEG HD 1920x1080 29.97p
來源:
Kyodo News
物件名稱:
14-10-17-1-12.mov