HS2 Construction Works Great Missenden

A CAT hydraulic excavator and a Volvo articulated hauler are used in preparatory works for the construction of the HS2 high-speed rail link on 17th April 2024 in Great Missenden, United Kingdom. Construction of the first leg of HS2 began in September 2020 but high-speed trains are not expected to run on the line until at least 2029. HS2 is the largest infrastructure project in Europe. (photo by Mark Kerrison/In Pictures via Getty Images)

HS2 Construction Works Great Missenden
A CAT hydraulic excavator and a Volvo articulated hauler are used in preparatory works for the construction of the HS2 high-speed rail link on 17th April 2024 in Great Missenden, United Kingdom. Construction of the first leg of HS2 began in September 2020 but high-speed trains are not expected to run on the line until at least 2029. HS2 is the largest infrastructure project in Europe. (photo by Mark Kerrison/In Pictures via Getty Images)
購買授權
我可如何使用此圖片?
HK$2,250.00
HKD
Getty ImagesHS2 Construction Works Great Missenden, News PhotoHS2 Construction Works Great Missenden, News PhotoHS2 Construction Works Great Missenden Get premium, high resolution news photos at Getty ImagesProduct #:2147905447
HK$3,500HK$1,000
Getty Images
In stock

詳情

來源: Mark Kerrison / Contributor

Getty Images 的編輯內容,由備受信賴的專業視覺記者所拍攝。進一步了解我們的編輯內容政策。


限制條件:
關於所有商業或推廣用途,請聯絡您當地辦公室的業務代表。
編輯性內容編號:
2147905447
圖像集:
In Pictures
建立日期:
2024年04月17日
上傳日期:
授權類型:
發佈資訊:
無許可授權 更多資料
來源:
In Pictures
物件名稱:
MK-20240417-HS2-construction-works-Great-Missenden-0014
最大檔案大小:
5049 x 3366 像素 (42.75 x 28.50 cm) - 300 dpi - 12 MB