Lynn Funk of Walsh Construction shovels cement to be used to install security bollards in front of the Supreme Court. The bollards are being...
Rick Shipp of Flippo Construction, directs a backhoe that is tearing up the sidewalk on 1st Street, near East Capitol Street.
Rick Shipp of Flippo Construction, directs a backhoe that is tearing up the sidewalk on 1st Street, near East Capitol Street.
Rick Shipp of Flippo Construction, directs a backhoe that is tearing up the sidewalk on 1st Street, near East Capitol Street.
Welder William Vaden, cuts a pipe at a construction site on the East Front of the Capitol. Utility pipes are being laid to serve the Capitol Visitor...
Welder William Vaden, cuts a pipe at a construction site on the East Front of the Capitol. Utility pipes are being laid to serve the Capitol Visitor...
Workers and machinery dig a hole on the East Front of the Capitol, in order to lay utility pipes for the Capitol Visitor Center.
Lynn Funk of Walsh Construction shovels cement to be used to install security bollards in front of the Supreme Court. The bollards are being...
College students from St. Petersburg, Russia, pose with Antonio Claro, a snow removal supervisor, and a John Deere backhoe and that was involved with...
Backhoe sits in what will be the main auditorium of the the Atlas Performing Arts Center on H street, NE.
Thomas Gary of Structural & Soil Systems, Inc., watches as a back-hoe moves concrete on the East Front of Capitol in order to uncover the water main...