Solar Panels Installed On Roof Of York Minster

YORK, ENGLAND - OCTOBER 31: Engineers from Associated Clean Technologies work to attach solar panels to the roof of York Minster on October 31, 2024 in York, England. The roof of York Minister is being equipped with 184 solar panels, as a step towards reducing the cathedral's carbon footprint by approximately 13 tonnes of CO2 per year. The panels are expected to generate close to 70,000 kWh annually, or roughly a third of York Minster's total energy consumption. (Footage by Ian Forsyth/Getty Images)

YORK, ENGLAND - OCTOBER 31: Engineers from Associated Clean Technologies work to attach solar panels to the roof of York Minster on October 31, 2024 in York, England. The roof of York Minister is being equipped with 184 solar panels, as a step towards reducing the cathedral's carbon footprint by approximately 13 tonnes of CO2 per year. The panels are expected to generate close to 70,000 kWh annually, or roughly a third of York Minster's total energy consumption. (Footage by Ian Forsyth/Getty Images)
購買授權

請告訴我們您希望何時、何地及如何使用此資產,以獲得個人化價格。

詳情

來源: Ian Forsyth

Getty Images 的編輯內容,由備受信賴的專業視覺記者所拍攝。進一步了解我們的編輯內容政策。


編輯性內容編號:
2182093980
圖像集:
Getty Images News Video
建立日期:
2024年10月31日
上傳日期:
授權類型:
權利準備 (Rights-Ready)
發佈資訊:
無許可授權 更多資料
短片長度:
00:00:15:02
位置:
York, England, United Kingdom
原版:
MPEG-4 8-bit H.264 4K 3840x2160 30p
來源:
Getty Images News Video
物件名稱:
img_5693ianforsyth