Discovery Mission to ISS

379781 01: With the Rotating Service Structure rolled back, Space Shuttle Discovery is revealed on the Mobile Launcher Platform at Launch Pad 39A October 5, 2000 at Kennedy Space Center, Florida. Discovery is being readied for the STS-92 mission launch to the International Space Station (ISS). At the top is the 13-foot-wide "beanie cap," at the end of the Gaseous Oxygen Vent Arm designed to vent gaseous oxygen vapors away from the Space Shuttle. Lower is the Orbiter Access Arm with the environmental chamber, known as the "white room," extended to the orbiter. The chamber provides entry for the crew into the orbiter and also serves as emergency egress up to 7 minutes 24 seconds before launch. The STS-92 mission payload includes Integrated Truss Structure Z-1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power; Ku-band communication to support early science capability and U.S. television; and the third Pressurized Mating Adapter to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The 11-day mission will include four spacewalks. Liftoff is scheduled for October 6, 2000 at 9:16 p.m. EDT. (Photo by Newsmakers)

Discovery Mission to ISS
379781 01: With the Rotating Service Structure rolled back, Space Shuttle Discovery is revealed on the Mobile Launcher Platform at Launch Pad 39A October 5, 2000 at Kennedy Space Center, Florida. Discovery is being readied for the STS-92 mission launch to the International Space Station (ISS). At the top is the 13-foot-wide "beanie cap," at the end of the Gaseous Oxygen Vent Arm designed to vent gaseous oxygen vapors away from the Space Shuttle. Lower is the Orbiter Access Arm with the environmental chamber, known as the "white room," extended to the orbiter. The chamber provides entry for the crew into the orbiter and also serves as emergency egress up to 7 minutes 24 seconds before launch. The STS-92 mission payload includes Integrated Truss Structure Z-1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power; Ku-band communication to support early science capability and U.S. television; and the third Pressurized Mating Adapter to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The 11-day mission will include four spacewalks. Liftoff is scheduled for October 6, 2000 at 9:16 p.m. EDT. (Photo by Newsmakers)
購買授權
我可如何使用此圖片?
HK$2,250.00
HKD
Getty ImagesDiscovery Mission to ISS, News PhotoDiscovery Mission to ISS, News PhotoDiscovery Mission to ISS Get premium, high resolution news photos at Getty ImagesProduct #:666143
HK$3,500HK$1,000
Getty Images
In stock
請注意:呈現歷史事件的圖片可能包含不反映現今理解的主題或描述。它們以歷史背景提供。了解更多。

詳情

來源: Getty Images / 全職

Getty Images 的編輯內容,由備受信賴的專業視覺記者所拍攝。進一步了解我們的編輯內容政策。


限制條件:
Contact your local office for all commercial or promotional uses. Full editorial rights UK, US, Ireland, Canada (not Quebec). Restricted editorial rights for daily newspapers elsewhere, please call.
編輯性內容編號:
666143
圖像集:
Hulton Archive
建立日期:
2000年10月06日
上傳日期:
授權類型:
發佈資訊:
無許可授權 更多資料
來源:
Hulton Archive
物件名稱:
37978101disc_20010628_18076.jpg
最大檔案大小:
2670 x 1771 像素 (22.61 x 14.99 cm) - 300 dpi - 2 MB